Commissioning works

Home Commissioning works

Commissioning works

It is not enough to design, install and connect the electrical network and equipment. The final step in any electrical process is commissioning. They determine how well the entire system will work.

Therefore, it is important that professionals are engaged in this process – you are unlikely to be able to carry out the work correctly on your own. You can order equipment customization in Moscow in our company. Experienced specialists will organize the whole range of measures and make sure that the system and equipment work for a long time and stably.

What is PNR?

Commissioning, or commissioning, is a whole range of measures, without which it is impossible to imagine the launch of an electrical system and electrical equipment. It implies not only comprehensive testing of all elements of the system, checking for its readiness for operation, but also setting the electrical parameters to optimal ones under the given operating conditions.

Preparation for equipment startup is a complex multi-stage process, which includes:

Detailed analysis of the design documentation and its compliance with the real electrical system and equipment;
Testing and, if necessary, setting up emergency automatic systems;
Checking the performance of the RCD;
Detailed setting of ATS;
Insulation resistance measurement;
Checking the operability of the automation and the correctness of the operation of the protective grounding circuit;
Checking the operation of relay protection devices;
Configuring and testing all switching devices connected to the system;
High voltage testing of all equipment.

The list can be expanded if necessary. The testing of installed equipment does not always follow the same template, and the set of measures may differ depending on the type and scale of the system. In this case, our specialists can say whether additional processes are needed even before the start of commissioning.

Stages of the

Setting up the equipment of electrical systems takes place in several stages. The final performance of the entire system depends on the correctness of their implementation:

Preparatory stage. This is the start of any PNR. Our experts will check that all the elements of electrical equipment comply with the project and documentation. This is done to eliminate any problems during the commissioning of the electrical network and equipment. Also at this stage a detailed work plan is drawn up.
Test runs. Individual nodes and units of equipment are checked and run in test mode; cable lines and wiring are tested for stability and resistance to temporary voltage surges and overloads. Our experts draw up a protocol of each check so that you can familiarize yourself with the results.
Introductory stage. Under the supervision of masters, the system is fully launched for the first time. It undergoes both full and stage-by-stage testing of individual sections of the system. Electricians check the operation of the equipment in terms of protection, blocking, control, switching to backup power. If all the parameters are correct, the system elements are adjusted to the operating modes required in this configuration.
Comprehensive testing. The final stage, which involves checking the interaction of already configured equipment and other elements of the system for the correctness of interaction.

If you want to make sure that your equipment is running correctly – call us! We provide a full range of services in the field of commissioning works in Moscow and the Moscow region.